Equipment supply
|
‘Supply’ is the flow of resources used to satisfy a demand, such as materials, labour, information and skills – from a supplier to a user or consumer.
Equipment supply – in a construction sense – is the flow of equipment from a supplier to a site with the aim of facilitating the construction process. For example, the supply of an excavator to help dig the foundations, or a crane to lift heavy materials.
Very broadly, the term ‘equipment’ generally refers to apparatus that is used for specific purposes, e.g pumps are used to pump water, angle grinders are used to cut through hard materials. This is as opposed to individual tools such as screwdrivers, hammers and trowels which are instruments that are generally used by hand.
Usually, a contractor or sub-contractor orders the equipment from a supplier to complete a particular task. Because construction equipment can be very costly, and because it may sometimes be needed by a contractor or sub-contractor for only small duration during the year, it may be financially advantageous to hire the equipment only for the period it is required. This is not only cheaper for the contractor but also means the equipment does not require storage. Also, hiring the equipment means the contractor does not have to maintain it.
The following is a selection of typical equipment that may be supplied to a construction site:
- Access equipment.
- Attachments
- Bowsers
- Compressors
- Dumpers
- Forklifts/telehandlers
- Mixers
- Pumps
- Rollers
- Skips
- Topsoil screeners
- Wheeled excavators.
Equipment may also be required for inclusion in the building itself, for example; washing machines, coffee machines and scanning equipment, fume cupboards and so on.
In this case, it is important to identify equipment that will be provided by the contractor as part of the main contract and equipment which will be provided outside of the main contract (because the client may already have the equipment, or they may have existing suppliers). This is particularly important where equipment supplied outside of the main contract may have an impact on the construction works, perhaps needing to be accommodated in a certain location, or requiring fixing, power supply, air supply, water, drainage, telecommunications connection, etc.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Government approach could undermine delivery and regeneration.
World's first mass timber data centre.
The overlooked environmental aspect of data centre development.
Introduction to radon awareness
New technical information sheet published by CIOB.
Updated supplier guide can help electrical contractors engage with NHP.
CIAT confirm the winners of the 2026 architectural technology awards.
Government launches a one stop shop for flood preparedness.
Sir Edwin Lutyens: Britain's greatest architect? Book review.
CIOB publishes free template to help assess and manage risks.
ECA's reflections on Party Conference season
Burnham wants to be confident of winning before asking for a fresh mandate.
New Chief Construction and Scientific Adviser
Sergio Cavalaro, Professor of Infrastructure Systems at Loughborough University.
Building safety levy for England
CIAT publish estimator tool for members.
Water sector faces a growing crisis that could slow the delivery of vital infrastructure.